Sports hall acoustics – a key element of comfort and performance
Reverberation time in a sports hall is capped: 1.5 s up to 5000 m³, 1.8 s above that. Where the requirement comes from, when it applies, and how to calculate how much absorption a 3000 m³ hall needs.
For designers and investors who are building or refurbishing a sports hall or gymnasium.
An empty sports hall is several thousand cubic metres of air enclosed between hard surfaces. Sound bounces around for so long that the reverberation time often exceeds 5 seconds. The whistle blurs, instructions have to be repeated, and noise during lessons usually exceeds 80 dBA.
Since 2018 this is no longer just a matter of comfort. The Polish building regulations (Warunki Techniczne) invoke the PN-B-02151-4:2015-06 standard, which sets a specific upper limit on reverberation time for halls. Below: what that limit is, when it has to be met, and how to check it by calculation before ordering the ceiling.
What the standard says and where its force comes from
The regulation on technical building requirements (WT) requires public-use rooms to be protected against “reverberant noise arising from reflections of sound waves off boundary surfaces” (§ 323 para. 2 item 4). The amendment of 14 November 2017 (Dz.U. 2017 item 2285), in force since 1 January 2018, added the PN-B-02151-4:2015-06 standard to Annex 1. Meeting its requirements is treated as meeting this provision.
Scroll horizontally to see all columns
When the requirement applies
New hall: yes. The technical building regulations apply to design and construction (§ 2 para. 1 WT).
Refurbishment and change of use: yes. The same § 2 para. 1 covers both cases, and the standard itself explicitly mentions modernisation and conversion of rooms.
Existing hall with no refurbishment: the regulations do not require you to improve it. But if the reverberation is several seconds, the hall works badly regardless of the rules. That is a good moment for an acoustic study.
Projects submitted before 1 January 2018 were covered by the transitional provisions of the amendment.
Calculate it yourself: a 3000 m³ hall
Take a hall of 25 × 12 × 10 m, i.e. V = 3000 m³ — below 5000 m³, so the target is 1.5 s. Sabine formula: T = 0.161 × V / A, giving the required absorption area A = 0.161 × 3000 / 1.5 = 322 m².
Suppose a measurement in the empty hall gave 5 s. The current absorption area is then 0.161 × 3000 / 5 ≈ 97 m². About 225 m² is missing. The ceiling is 300 m². If we cover all of it with class A panels (αw at least 0.90) instead of a hard surface absorbing about 0.05, we gain 300 × (0.90 − 0.05) = 255 m². Total A ≈ 352 m², so T ≈ 483 / 352 ≈ 1.37 s. The result is within the limit, but with only a small margin.
This is a single-number calculation, while the standard requires the limit to be met in every band from 250 to 4000 Hz. That is why a project calculates band by band, using the data of the specific product. Experience also shows that the ceiling alone is not enough: in an ordinary box-shaped hall, the recommendation is to cover about 70–80% of the ceiling and 10–20% of the walls with a material of αw ≥ 0.9. The walls damp horizontal reflections that the ceiling does not catch. More on the rating itself: absorption class αw.
Frequently asked questions
Is the PN-B-02151-4 standard mandatory?
Polish Standards are voluntary in themselves, but this one is invoked by the technical building regulations (Annex 1, since 1 January 2018). In practice, the design of a new or refurbished hall should demonstrate that the reverberation time is within the limit.
Is the limit checked with spectators in the stands?
No. The values apply to the finished hall with permanently installed fittings, without people. People add absorption, so reverberation is shorter during a match. Acceptance measurement, however, is done in the empty hall.
Why does a larger hall get a more lenient limit?
Reverberation time grows with volume. With the same amount of material, a larger hall reverberates for longer, which is why the standard allows 1.8 s above 5000 m³. That still requires a large area of sound-absorbing material.
Sources
- Ecophon — Polska Norma PN-B-02151-4:2015-06. Objaśnienia i komentarze (requirements for sports halls, scope of application, design guidance)(opens in a new tab)
- Regulation of the Minister of Infrastructure and Construction of 14 November 2017 amending the regulation on technical building requirements (Dz.U. 2017 item 2285) — ISAP(opens in a new tab)
- Technical building requirements, Chapter IX “Protection against noise and vibration” (§ 323, § 326) — consolidated text(opens in a new tab)
- PN-B-02151-4:2015-06 — standard page in the PKN shop(opens in a new tab)