The acoustics of a new hall are cheapest to settle at the design stage. Five steps: volume, reverberation target, absorption area, placement and impact resistance class — with a calculation showing how the 5000 m³ threshold works.

For architects and designers leading the design of a new sports hall or gymnasium.

Steps 1–3: volume, target, absorption area

Required absorption area A for two halls on either side of the 5000 m³ threshold (Sabine formula)
HallVolume VLimit TRequired A = 0.161 × V / T
30 × 18 × 9 m4860 m³1,5 s≈ 522 m²
36 × 18 × 9 m5832 m³1,8 s≈ 522 m²

Scroll horizontally to see all columns

Step 4: placement

Step 5: impact resistance class and reaction to fire

Frequently asked questions

  • Is the Sabine formula enough for design?
  • Do stands and spectators count toward the absorption?
  • Is absorption class A on the ceiling enough?